SRGZ$0.012+9.09%
Gold$2650.50+0.47%
Silver$31.25+1.46%

Walker Lane Belt

Longstreet Gold & Silver Project

Nye County, Nevada

Longstreet is an established, high-potential heap-leach gold project located in Nevada with strong potential cash flows and a path to production.

Operation Type: Conventional open-pit, heap-leach operation with Simple "blast, crush, leach" process and Estimated low strip ratio of less than 1-to-1.

Longstreet Project Map
93,100 oz
Gold Resource
Indicated (2021 PEA)
2.3M oz
Silver Resource
Indicated (2021 PEA)
~$40M
Initial CapEx
Total to start production
Up to $75M
Annual Cash Flow
At current metal prices

PEA 2021 Resource Estimate

93,100 oz
Gold
Indicated
2.28M oz
Silver
Indicated

At $1,500 Au gold price cutoff

Upside Potential: At current prices, the cut-off grade will likely decrease, moving material from the waste pile to the leach pad, increasing production and cash flow.

Capital & Path to Production

1

Final Permitting

~$4 Million

To finalize all necessary permits, and additional drilling and approvals

2

Mine Construction & Production Start-Up

~$36 Million

For all site development, construction to start production

3

Timeline to Production

With the Plan of Operations submitted, the project is on path to production within 2 years

Total Initial CapEx
~$40 Million
To start production

Annual Cash Flow Projections

Gold PriceSilver PriceAnnual Net Cash Flow
$2,500/oz$25/oz~$38 Million
$2,700/oz$30/oz~$45 Million
$3,000/oz$35/oz~$53 Million
$3,500/oz$40/oz~$68 Million

Based on updated 2021 PEA Report. PEA 2021 Resource (at $1,500 Au): 93,100 oz Gold & 2,276,000 oz Silver (Indicated).

Target Zones

Main Zone

0.019 oz/ton Au

Average grade per 2021 PEA

Primary Target

Cypress Ridge

0.325 oz/ton Au

Best surface sample assays

North Slope

0.529 oz/ton Au

Best surface sample assays

Red Knob

0.086 oz/ton Au

Best surface sample assays

Opal Ridge

0.014 oz/ton Au

Best surface sample assays

Spire

0.013 oz/ton Au

Best surface sample assays

West Main

Not well sampled, often covered by post-mineral rock

NE Main

Not well sampled, often covered by post-mineral rock

De-Risked Permitting

All major environmental studies complete
All species studies complete
All archaeological studies complete
Private water rights secured
Plan of Operations submitted

Production possible within two years

Location

Geographic Location

  • Coordinates: 38°22′0″ N, 116°40′00″ W
  • 275 km (171 miles) northwest of Las Vegas
  • 92 km (57 miles) northeast of Tonopah
  • Region: Walker Lane Belt

Property Details

  • Total Area: 1,149 hectares
  • Claims: 137 unpatented + 5 leased
  • Northeast-southwest oriented
  • Approximately 3 km (1.9 miles) along strike within the Monitor Range

Drilling History

Reverse Circulation (RC) Drilling

Total Holes:403+
Total Meters:24,700m

Diamond Drilling

Total Holes:19
Total Meters:1,310m

Project Gallery

Longstreet Project Photo 1
Longstreet Project Photo 2
Longstreet Project Photo 3
Longstreet Project Photo 4

Technical Documents

Star Gold Fact Sheet

Download

SK 1300 Resource Report

December 8th

Download

2021 Preliminary Economic Assessment

Download

1988 Preliminary Economic Assessment

Download